Back to Meetings & Agendas

Regular Board Meeting Watch in English

Thu 3/23/2017
9:00 a.m.
One Gateway Plaza, Los Angeles, CA 90012, 3rd Floor, Metro Board Room

View on the Metro website

Submit public comment remotely

During the meeting

By phone:

You may join the public comment participation call 5 minutes prior to the start of the meeting.

Dial-in: 202-735-3323
English Access Code: 5647249#
Spanish Access Code: 7292892#

To give public comment on an item, enter #2 (pound two) when that item is taken up by the Board.

Need assistance with your audio? Please dial 888-796-6118.

When you call in to comment, you will be able to hear the live stream of the meeting while you wait to comment. If you are also listening to the meeting on another device, please lower the volume on the second device to avoid feedback and ensure you can be heard clearly.



Board Reports

Click "View" to go to the board report detail page.
Click "Download" to download a copy of board report and its attachments.

2. 2017-0129 APPROVE Minutes of the Regular Board Meeting held February 23, 2017 Approved View Download
6. 2016-0987 APPROVE the Resolution in Attachment A to: A. AUTHORIZE the Chief Executive Officer (CEO) or his designee to claim $7,750,898 in fiscal year (FY) 2016-17 LCTOP grant funds for one year of Gold ... Approved View Download
7. 2016-0807 CONSIDER: A. AUGMENTING the Life-of-Project (LOP) Budget for the P2000 Light Rail Vehicle Overhaul Program (CP 206044) by $30,000,000 adjusting the LOP Budget from $130,800,000 originally ... Approved View Download
8. 2017-0051 APPROVE the release of the draft Measure M Master Guidelines for public review. None View Download
10. 2017-0066 AUTHORIZE the Chief Executive Officer (CEO) to: A. EXECUTE Modification No. 6 to Contract No. AE354280011791 with RNL Interplan, Inc. (RNL) for the Willowbrook/Rosa Parks Station Improvement ... Approved View Download
11. 2016-0997 AUTHORIZE the Chief Executive Officer, in accordance with the 2006 Board adopted Bicycle Transportation Strategic Plan (Attachment C), to award a Contract No. PS67785000 (Contract) to Estolano ... Approved View Download
13. 2017-0023 AUTHORIZE the Chief Executive Officer to execute two Easement Agreements allowing construction of a portion of the Hope/2nd Street Pedestrian Bridge to be built on, and Metro patron access ... Approved View Download
17. 2017-0075 APPROVE bylaws revisions for Metro’s Citizens’ Advisory Council (CAC). Approved View Download
19. 2017-0114 ADOPT staff recommended positions: A. AB 287 (Holden) - State Highway Route 710: Advisory Committee OPPOSE UNLESS AMENDED B. AB 378 (C. Garcia) - California Global Warming Solutions Act of ... Approved View Download
20. 2017-0149 AWARD a cost plus fixed fee contract for Technical and Program Management Support Services under Contract No. OP20113000 for the P2000 Light Rail Vehicle Overhaul Program Consultant Support ... Approved View Download
21. 2016-0881 CONSIDER: A. FINDING that compliance with PUC sections 130232 and 130233 does not constitute a method of procurement adequate for the operation of prototype equipment and herewith approves the ... Approved View Download
22. 2016-0969 AUTHORIZE the Chief Executive Officer to award a five-year, indefinite delivery/indefinite quantity Contract No. PS28069-2000, for space planning/installation services and furniture, to M3 ... Approved View Download
1. 2017-0189 SPECIAL Recognition of former Director Diane DuBois. None View Download
3. 2017-0185 Report by the Chair. None View Download
4. 2017-0186 Report by the Chief Executive Officer. None View Download
5. 2017-0047 RECEIVE AND FILE report on FY2018 Program Management Annual Program Evaluation (APE). None View Download
9. 2016-0835 CONSIDER: A. RECEIVING AND FILING update on Vermont BRT Corridor Technical Study; B. APPROVING the findings and recommendations from the North Hollywood to Pasadena Bus Rapid Transit (BRT) ... None View Download
9.1. 2017-0192 WITHDRAWN: CONSIDER Motion by Directors Solis, Fasana and Barger that the Board direct the CEO to conduct a cooperative technical study with Foothill Transit to: A. Establish an electric bus ... None View Download
26. 2017-0146 CONSIDER: A. APPROVING the award of and authorize the Chief Executive Officer to execute a cost-plus fixed fee Contract No. AE66758000 to perform preliminary engineering and complete final ... Approved View Download
27. 2017-0087 CONSIDER: A. HOLDING a public hearing on the proposed Resolution of Necessity; and B. ADOPTING the Resolution of Necessity authorizing the commencement of an eminent domain action to ... Approved View Download
28. 2017-0121 CONSIDER: A. APPROVING the recommended Alternative 2 with six Regional Rail run-through tracks and two High Speed Rail run-through tracks (also referred to as “6+2 Run Through Tracks” ... None View Download
29. 2017-0187 ADOPT staff recommended position: AB 17 (Holden) - Transit Pass Program: Free or Reduced-Fare Transit Passes SUPPORT Adopted View Download